tech pic

Tunnel Requirements

A = 114" (289.5cm) adjustable
B = 144"(366cm)

Hydraulic:
Side Washer 3 GPM 60RPM

Water:
1/2" NPT

Tunnel CL = 28" from inside conveyor rail