tech pic

Tunnel Requirements

A = 153" (388.6 cm)
B = 127" (332 cm)
C = 114" (289.5 cm) adjustable

Hydraulic:
3 GPM 60 RPM

Water:
1/2" NPT

Tunnel CL = 28" from inside conveyor rail (71 cm)