tech pic

Tunnel Requirements

A = 153" (388.6 cm)
B = 187" (475 cm)
C = 114" (289.6 cm) adjustable

Wrap hydraulic 3 GPM
Mitter hydraulic 3 GPM

Water:
1/2" NPT

Tunnel CL = 28" (71 cm) from inside conveyor rail